CASE STUDY
Smart production line unlocks more jobs and new contracts
LISI AEROSPACE provisionally secured additional funding for two more production lines by 2027.
30 March 2025
CASE STUDY
Cutting carbon emissions for construction giant
Demonstrating low-carbon concrete alternatives.
30 March 2025
CASE STUDY
MTC and AMRC’s factory design and development
Collaboration between MTC and AMRC Cymru, part of the University of Sheffield, to design a reconfigurable factory for scalable production of both fuel cells and electrolysers.
2 July 2024
CASE STUDY
The Manufacturing Technology Centre worked with High Value Manufacturing Catapult colleagues and a Winter Paralympian to develop an award-winning sit-ski that’s lighter and more aerodynamic than conventional models.
24 January 2024