Sort by:

CASE STUDY

AWESIM results for nuclear welding

Nuclear AMRC helps AWESIM consortium develop a game-changer for fusion welding, enabling quicker delivery at reduced cost and waste.

6 February 2023

Two people test a manufacturing product

CASE STUDY

Slashing waste for recyclable Alternative Pallets

WMG helped the Alternative Pallet Company save 6 tonnes of waste per month and build a profitable new product line

6 February 2023

CASE STUDY

Scaling up a new process to create synthetic DNA

CPI helped Touchlight to scale-up their cell-free dbDNA process, grow their business and secure £147m private investment.

6 February 2023

CASE STUDY

Using robotics to reduce chemicals in agriculture

The MTC helped Bardsley England increase yield, save costs on chemicals and slash emissions with autonomous crop inspection.

6 February 2023

Ultimate Battery Company in front of F2050

CASE STUDY

Battery of the future powering South Yorkshire investment

The AMRC helped to bring the Ultimate Battery Company to South Yorkshire, along with future economic benefits to the region and a positive environmental contribution to global net zero targets

6 February 2023

(L-R) Katherine Bennett CBE, HVM Catapult CEO; Professor Paul Maropoulos, AMIC director; Professor Ian Greer, Queen’s University vice-chancellor; Sam Turner, HVM Catapult CTO, and incoming AMIC CEO; Kara Baili

GUIDE

How we work with SMEs

4 April 2022

CASE STUDY

Smart waste management

The robotic system is powered by Recycleye Vision – a world-leading AI computer vision system which detects all items on waste streams by material, item, and even brand.

3 February 2022

CASE STUDY

Go with the flow – saving material and time with a forging alternative

Forging may be considered the ‘gold standard’ of production methods for high pressure and high temperature sectors but it can mean material wastage of up to 80%.

3 February 2022

CASE STUDY

Saving tonnes of carbon in nuclear welding

Welding the thick-walled steel sections of a reactor pressure vessel is an extremely time-consuming task, with each join taking around ten days to complete and releasing tonnes of carbon.

3 February 2022

CASE STUDY

Revolutionising the rail industry with augmented reality

The system monitors real-time performance of station services, allowing swift detection and repair of faults within the station’s lifts, escalators and travelators, as well as signalling equipment along the high-speed line.

3 February 2022

CASE STUDY

Metal additive manufacturing for lightweight helicopter parts

A process design and topology optimisation study was undertaken, beginning with a baseline stress analysis for a current machined-from-solid AlSi10Mg aluminium alloy handle, in order to evaluate different AM handle designs and also a hollow handle, indicating weight savings of between 20% and 45% were possible.

3 February 2022