Sort by:
Ultimate Battery Company in front of F2050

CASE STUDY

Battery of the future powering South Yorkshire investment

The AMRC helped to bring the Ultimate Battery Company to South Yorkshire, along with future economic benefits to the region and a positive environmental contribution to global net zero targets

6 February 2023

UWE Bristol Vice-Chancellor Professor Steve West (left); HVM Catapult CEO Katherine Bennett CBE (centre); and Professor Elena Marco, Pro Vice-Chancellor and Head of College of Arts, Technology and Environment (right)
Katherine Bennett, CEO, HVM Catapult
(L-R) Katherine Bennett CBE, HVM Catapult CEO; Professor Paul Maropoulos, AMIC director; Professor Ian Greer, Queen’s University vice-chancellor; Sam Turner, HVM Catapult CTO, and incoming AMIC CEO; Kara Baili

GUIDE

How we work with SMEs

4 April 2022

CASE STUDY

Developing premium sustainable bio-packaging

Packaging matters in every sector, With over two megatons of plastic packaging waste in the UK each year, a more sustainable alternative is sorely needed.

3 February 2022

CASE STUDY

Smart waste management

The robotic system is powered by Recycleye Vision – a world-leading AI computer vision system which detects all items on waste streams by material, item, and even brand.

3 February 2022

CASE STUDY

Go with the flow – saving material and time with a forging alternative

Forging may be considered the ‘gold standard’ of production methods for high pressure and high temperature sectors but it can mean material wastage of up to 80%.

3 February 2022

CASE STUDY

Waste slate turned into roof tiles

The MTC team modelled the full production process of Carapace’s tiles, identifying crucial areas of improvement at each step. By moving to a system of easily interchangeable tooling, they were able to slash downtime for retooling to 10 minutes.

3 February 2022

CASE STUDY

Saving tonnes of carbon in nuclear welding

Welding the thick-walled steel sections of a reactor pressure vessel is an extremely time-consuming task, with each join taking around ten days to complete and releasing tonnes of carbon.

3 February 2022