Sort by:

CASE STUDY

Magway cuts costs with sustainable bio-composite

The growth in online shopping has exploded in the past decade and with COVID-19 as a backdrop, the one-click delivery of household goods is not only convenient, it’s also safer.

3 February 2022

CASE STUDY

Lightweight battery concept drives down emissions

The new concept is not only highly cost effective and sustainable but is now ready for transformation into an industry demonstrator.

3 February 2022

CASE STUDY

Key role in Driving the Electric Revolution

The UK is planning to reach net zero carbon emissions by 2050, with 78% of the reduction in carbon emissions planned for 2035. Such an ambitious target calls for radical restructuring of all forms of transport.

3 February 2022

CASE STUDY

Seismic II takes schools to the next level

Large public works, like schools and hospitals, are increasingly benefitting from the faster delivery of modern methods of construction, such as modular building. The catch is that there are many platforms for modular structures that can prove incompatible, leading to potential waste and increased cost.

3 February 2022

CASE STUDY

Smart, sustainable homes for the future

An estimated 345,000 homes need to be built in the UK each year to meet demand. To reach the Government’s target of net zero by 2050, each of them will need to have impeccable green credentials. Achieving this requires examining radical solutions.

3 February 2022

CASE STUDY

Environmentally friendly solution for wind turbine installation

With funding from the Offshore Wind Growth Partnership, the NCC worked with Cedeco to develop an early-stage concept for a composite gripper, which would hold an offshore wind turbine leg in place without so much need for environmentally invasive reinforcement.

3 February 2022

CASE STUDY

End-to-end hydrogen – supporting critical infrastructure

Hydrogen is a powerful fuel source that has the potential to revolutionise a number of sectors, including transport. With almost zero carbon emissions and a high energy density, this abundant gas promises to be a key element of delivering net zero whilst satisfying the increasing national need for energy.

3 February 2022

Nuclear Advanced Manufacturing Research Centre

CASE STUDY

Creating jobs in nuclear energy

Nuclear is an obvious answer, but lead times are lengthy and the financing challenges for large reactors are formidable.

3 February 2022

CASE STUDY

Pressing ahead with rehab revolution

The AMRC has helped a Sheffield SME transform healthcare by making a rehabilitation innovation 11% lighter and cutting the cost of manufacturing for three components by a combined 73%.

3 February 2022

CASE STUDY

Supporting patients with cerebral palsy

The current standing frames have a number of limitations, including high cost of manufacture, ease of use for medical professionals and carers, and the bespoke nature of each frame making it difficult to re-adapt them for other patients.

3 February 2022

CASE STUDY

Developing an aerosol-generating procedure shield to protect NHS workers

Identified as an opportunity to reduce the exposure our healthcare workers face when treating patients, the enhancement offers a number of benefits, including a substantial weight reduction from 9kg to 4.5kg, improved visual clarity and ease of use.

3 February 2022

CASE STUDY

Leading the Ventilator Challenge

On the 16th of March 2020, the Government asked UK industry to support the NHS in its fight against COVID-19. The VentilatorChallengeUK (VCUK) Consortium, led by the HVM Catapult’s outgoing CEO Dick Elsy and made up of more than 33 businesses from the aerospace, automotive and medical sectors, came together at speed to build medical ventilators.

3 February 2022