Smart, sustainable homes for the future

An estimated 345,000 homes need to be built in the UK each year to meet demand. To reach the Government’s target of net zero by 2050, each of them will need to have impeccable green credentials. Achieving this requires examining radical solutions.

An estimated 345,000 homes need to be built in the UK each year to meet demand. To reach the Government’s target of net zero by 2050, each of them will need to have impeccable green credentials. Achieving this requires examining radical solutions. Developed with support of the AMRCHLM Architects’ ‘Forever Home’ platform is designed for manufacturing, assembly and disassembly, allowing a next generation of fully flexible and easily upgradeable modular homes. This means not only that more sustainable materials than high-emission cement could be used in the first instance, but that homes could potentially be upgraded over time as more net zero standards and materials become available.

A finalist for the RIBA Home of 2030 Design award, the platform aims to help solve the housing crisis whilst also tackling the capacity and compatibility issues that other offsite construction methods suffer from. The goal is a universal design standard that would enable any modern methods of construction system to deliver the same high-quality, sustainable and affordable homes with interchangeable parts. Now introduced to Homes England, this platform could set the new standard for sustainable homes in the UK.

Image credit: HLM Architects

 

Back to Building a greener recovery

Can we help?

"*" indicates required fields

Name*

Explore more case studies like this

View all case studies

CASE STUDY

Seismic II takes schools to the next level

Large public works, like schools and hospitals, are increasingly benefitting from the faster delivery of modern methods of construction, such as modular building. The catch is that there are many platforms for modular structures that can prove incompatible, leading to potential waste and increased cost.

3 February 2022

Nuclear Advanced Manufacturing Research Centre

CASE STUDY

Creating jobs in nuclear energy

Nuclear is an obvious answer, but lead times are lengthy and the financing challenges for large reactors are formidable.

3 February 2022

CASE STUDY

Environmentally friendly solution for wind turbine installation

With funding from the Offshore Wind Growth Partnership, the NCC worked with Cedeco to develop an early-stage concept for a composite gripper, which would hold an offshore wind turbine leg in place without so much need for environmentally invasive reinforcement.

3 February 2022

whois: Andy White Freelance WordPress Developer London