CASE STUDY
The robotic system is powered by Recycleye Vision – a world-leading AI computer vision system which detects all items on waste streams by material, item, and even brand.
3 February 2022
CASE STUDY
As the lead on industrial processes, the HVM Catapult has identified the key areas that should be of global focus: net zero design and make; and tracking emissions throughout manufacturing supply chains.
3 February 2022
CASE STUDY
Metal additive manufacturing for lightweight helicopter parts
A process design and topology optimisation study was undertaken, beginning with a baseline stress analysis for a current machined-from-solid AlSi10Mg aluminium alloy handle, in order to evaluate different AM handle designs and also a hollow handle, indicating weight savings of between 20% and 45% were possible.
3 February 2022
CASE STUDY
Seismic II takes schools to the next level
Large public works, like schools and hospitals, are increasingly benefitting from the faster delivery of modern methods of construction, such as modular building. The catch is that there are many platforms for modular structures that can prove incompatible, leading to potential waste and increased cost.
3 February 2022
CASE STUDY
Environmentally friendly solution for wind turbine installation
With funding from the Offshore Wind Growth Partnership, the NCC worked with Cedeco to develop an early-stage concept for a composite gripper, which would hold an offshore wind turbine leg in place without so much need for environmentally invasive reinforcement.
3 February 2022
CASE STUDY
End-to-end hydrogen – supporting critical infrastructure
Hydrogen is a powerful fuel source that has the potential to revolutionise a number of sectors, including transport. With almost zero carbon emissions and a high energy density, this abundant gas promises to be a key element of delivering net zero whilst satisfying the increasing national need for energy.
3 February 2022
CASE STUDY
Creating jobs in nuclear energy
Nuclear is an obvious answer, but lead times are lengthy and the financing challenges for large reactors are formidable.
3 February 2022
CASE STUDY
Helping construction reopen safely
Social distancing is key to reopening sections of the economy that have needed to close during the COVID-19 pandemic. Due to the group nature of the work, social distancing has particularly hit the UK construction sector, meaning many sites have been unable to operate normally.
3 February 2022
CASE STUDY
Leading the Ventilator Challenge
On the 16th of March 2020, the Government asked UK industry to support the NHS in its fight against COVID-19. The VentilatorChallengeUK (VCUK) Consortium, led by the HVM Catapult’s outgoing CEO Dick Elsy and made up of more than 33 businesses from the aerospace, automotive and medical sectors, came together at speed to build medical ventilators.
3 February 2022
CASE STUDY
Decision making robot could revolutionise manufacturing
Using a combination of machine learning and visual recognition, the robot can be taught to make assembly decisions based on the components put in front of it, in a breakthrough development which could save manufacturers the costs of expensive fixed tooling.
3 February 2022