Sort by:

CASE STUDY

AWESIM results for nuclear welding

Nuclear AMRC helps AWESIM consortium develop a game-changer for fusion welding, enabling quicker delivery at reduced cost and waste.

6 February 2023

CASE STUDY

Saving tonnes of carbon in nuclear welding

Welding the thick-walled steel sections of a reactor pressure vessel is an extremely time-consuming task, with each join taking around ten days to complete and releasing tonnes of carbon.

3 February 2022

Nuclear Advanced Manufacturing Research Centre

CASE STUDY

Creating jobs in nuclear energy

Nuclear is an obvious answer, but lead times are lengthy and the financing challenges for large reactors are formidable.

3 February 2022